The neighbours in.
Eight notices out.Party wall notices under the 1996 Act: who to serve, the periods, eight notices
A party wall notice tells an adjoining owner, before work starts, about work under the Party Wall etc. Act 1996: here a beam into the party wall, a new wall at the boundary and foundations dug near the house next door. In this recorded run the neighbouring owners, the engineer’s note and three situations went in. ArchX worked out which sections of the Act apply, who must be served and the notice periods, and prepared eight notices in Word and PDF. One is ready for dates and signatures, seven are drafts that say what is missing. 8 minutes 18 seconds.
The run in the video used the England edition of ArchX, with English terms, rules and pounds. In Ireland, ArchX works from the project documents and the local sources you open.
What goes in.
The owners of Nos. 12 and 16 from the title registers, and the engineer’s note on beam S1 and the 1.0 m deep foundations. The request set out three situations, the third a loft conversion at 7 Mill Terrace, and asked for notices ready to sign.
What ArchX does.
- 01
The beam
Pocketing S1 into the party wall with No. 12: a party structure notice under section 3, two months.
- 02
The new wall
Built wholly on the clients’ land: a line of junction notice under section 1(5), one month.
- 03
The excavations
No. 16 is 2.0 m away with footings about 0.6 m deep, so the 1.0 m foundations need a notice under section 6(1), one month. ArchX adds one for No. 12, beside the same foundations.
- 04
Mill Terrace
Four owners, the long leaseholders included. The tenant on a six-month tenancy is not an owner for these notices.
What comes back.
- Party structure notice to No. 12 as PDF and Word, ready for dates and signatures
- Seven drafts as PDF and Word, with the missing facts in brackets
- Each notice with a covering letter explaining the 14 days to reply and a response form
The figures from the run.
working time for one request
notices: one to sign, seven drafts
for the party wall work, one month for the wall and the excavations
What stays with you.
The drafts name their gaps: a wall height of 3,100 mm on the plan and 3,300 mm in the section, the engineer’s decision on underpinning, the building owner’s details at Mill Terrace. Service and start dates stay blank until fixed. You check every notice before it is served. Nothing has been served.
Where the video comes from.
A recorded run of the ArchX England edition on 12 October 2026 (test job S2, third request). The project is a test project with fictitious owners. The video shows this run, re-staged and sped up.
What the video says.
The video has music and no voice. This is the text that appears on screen, in the order of the video.
- The neighbours in. Eight notices out.
- Who owns next door, from the title registers
- Party wall, three situations: which sections of the Party Wall etc. Act 1996 apply, which notices, the notice periods and who must be served? Prepare the notices as documents ready to sign.
- Reads the owner references. Two neighbours, three owners. No. 12 has one owner, No. 16 has two, from the title registers.
- Reads the engineer's note. A beam into the party wall. Foundations 1.0 m deep, next door’s footings about 0.6 m.
- Screens the Party Wall Act. The beam: section 3, two months. A party structure notice to Mr C. Example at No. 12.
- Checks the excavations. Deeper, within 3 m: section 6. Excavation notices to No. 16 and No. 12, one month each.
- Verifies section 20 ownership. Four owners, not the tenant. 7 Mill Terrace: long leaseholders count, the tenant does not.
- Prepares eight document files. Letter, notice, response form. Eight notices in Word and PDF, dates left for service.
- Worked for 8 min 18 s
- Prepared eight notices in Word and PDF, each with a covering letter and response form. The S1 beam notice is ready for dates and signatures; the other seven are drafts. Nothing has been served.
- Party structure notice, ready to sign. The work: beam S1 pocketed into the wall. A covering letter that explains the 14 days. A response form for the neighbour to sign. Drafts name the gap: 3,100 or 3,300 mm? Eight notices: one to sign, seven drafts.
- 8 minutes. Eight party wall notices, with letters and forms. Real run: 8 min 18 s. One ready to sign, seven drafts with the gaps named.
- Real ArchX run, re-staged and sped up. Fictitious test project.
Explained briefly.
- Party structure notice
- The notice under section 3 for work to a party wall itself, here pocketing beam S1 into the wall with No. 12. The notice period is two months.
- Line of junction notice
- The notice under section 1(5) for a new wall built wholly on the building owner’s land at the boundary, here the new flank wall. The notice period is one month.
- Excavation notice (section 6)
- The notice for digging within 3 m of a neighbouring building and deeper than its foundations. Here 1.0 m foundations 2.0 m from No. 16, whose footings are about 0.6 m deep; one month.
Asked briefly.
Which party wall notice do I need?
It depends on the work. In this run a party structure notice under section 3 for the beam, a line of junction notice under section 1(5) for the new wall and notices under section 6(1) for the excavations.
What is the party wall notice period?
In this run two months for the party wall work under section 3 and one month for the new wall and the excavations. Each covering letter explains the 14 days the neighbour has to reply.
Does the tenant get a notice?
Not in this run. The notice goes to the long leaseholder; the tenant’s rights as occupier still matter for access.
When could the work start?
With valid notices served on 12 October 2026: from 12 November for the wall and the excavations, from 12 December for the party wall work, subject to any dispute being resolved.
Does this work if we draw in Revit, Vectorworks or AutoCAD?
Yes. No CAD file goes in: the input is notes in a text file. It makes no difference whether the practice draws in Revit, Vectorworks, AutoCAD, Archicad, Allplan or SketchUp.
The same task on your desk.
You have seen the video.
Now try it on your files.
Download ArchX for Mac or Windows, open a project folder and give it the same task. 7 days free, without payment details.