Three tenders in.
One recommendation out.Tender analysis and tender report from three returned tenders
A tender analysis checks each returned tender for arithmetic, missing work and qualifications, then compares the prices on the same footing. In this recorded run three tenders came back for a rear extension: one priced schedule in Excel and two letters as PDF. ArchX checked the sums, found what each builder left out, put the three prices on the same footing and wrote the tender report for the clients. It recommends Hartfield Build Ltd at £82,479.60 including VAT, subject to clarification, after 8 minutes 53 seconds of work.
The run in the video used the England edition of ArchX, with English terms, rules and pounds. In New Zealand, ArchX works from the project documents and the local sources you open.
What goes in.
The three returns as they arrived, the schedule of works that was issued, a summary of the invitation to tender and the drawings. The request was one message: check the tenders for arithmetic, qualifications and anything missing, compare like with like, and write the tender report with a recommendation.
What ArchX does.
- 01
Checks the arithmetic
Hartfield priced two rooflights at £1,450 each and carried £3,900, which is £1,000 too high. The invitation says tender sums stand, so ArchX does not correct the price. It flags the error to be referred back to the tenderer.
- 02
Finds what is left out
Mereworth is lowest on paper at £65,330 excluding VAT, but its letter leaves out the removal of the rear wall and the steel beam. For comparison ArchX adds those items at the median of the other tenderers’ prices: £69,906.50.
- 03
Reads the qualifications
Oakden cut the drainage provisional sum to £2,000 where £3,000 was issued and keeps its tender open for 30 days instead of the 56 asked for.
- 04
Compares and writes the report
It compares the three tenders including VAT, ranks them and writes down what has to be clarified before anyone is appointed.
What comes back.
- Tender report for the clients as PDF, six pages: the recommendation with its condition, the three tenders as submitted, adjusted and ranked, the checks behind it and a decision box to sign
- The same report as an editable Word document
- The comparison as an Excel spreadsheet
The figures from the run.
working time for one request, with no follow-up question
tenders checked line by line against the schedule that was issued
arithmetic error found in one line of a priced schedule
recommended tender including VAT, subject to clarification
What stays with you.
The recommendation is yours: ArchX prepares the report, you read it, decide and sign. The report says what is still open: Mereworth could become the cheapest if it includes the missing work within its original price, so the same questions go to both lowest tenderers first. Contract wording behind a licence, such as the JCT text itself, is named in the report as not checked. Nothing is sent to anyone.
Where the video comes from.
A recorded run of the ArchX England edition on 12 October 2026 (test job S3b). The project is a test project with fictitious builders and errors planted on purpose, so we know what there was to find. The video shows this run, re-staged and sped up.
What the video says.
The video has music and no voice. This is the text that appears on screen, in the order of the video.
- Three tenders in. One recommendation out.
- Three tenders, as they came back
- Three tenders came back for 14 Larch Walk. Please check them: arithmetic, qualifications, anything missing. Compare like with like and write the tender report for our clients with a recommendation.
- Reads the three returns. Three tenders read: one priced schedule and two tender letters.
- Checks the arithmetic. An error of £1,000. Hartfield: two rooflights at £1,450 each, carried as £3,900.
- Finds what is left out. Left out of the lowest price. Mereworth: rear wall removal and steel beam are not included.
- Checks the qualifications. Two conditions in the small print. Oakden: drainage sum cut to £2,000, open for 30 days instead of 56.
- Analyses the returned tenders. Compared like with like. What a tender left out is added at the median of the other prices.
- Writes the tender report. The tender report. Six pages for the clients, with a recommendation.
- Worked for 8 min 53 s
- Hartfield is recommended, subject to clarifying both lowest tenders before acceptance: £82,479.60 including VAT. Mereworth could become cheapest if it includes the missing work within its original price.
- Tender report for the clients, six pages. The recommendation, with its condition. Three tenders, adjusted and ranked. The £1,000 error, and what the rules say. A decision box for the clients to sign. Six pages as PDF and Word, plus Excel.
- 9 minutes. From three tenders to a checked recommendation. Real run: 8 min 53 s. Every tender checked line by line.
- Real ArchX run, re-staged and sped up. Fictitious test tenders.
Explained briefly.
- Tender analysis
- The check of returned tenders before anyone is appointed: arithmetic, completeness against the schedule that was issued, qualifications, and a comparison on the same footing. Here it ends in a tender report with a recommendation.
- Qualification
- A condition a tenderer attaches to its price, such as an excluded item or a shorter validity. Oakden kept its tender open for 30 days instead of the 56 asked for.
- Provisional sum
- An amount set in the tender documents for work that cannot yet be priced exactly, here £3,000 for drainage. A tenderer who changes it, as Oakden did, makes the prices harder to compare.
Asked briefly.
Does ArchX correct a tenderer’s arithmetic error?
Not in this run. The invitation to tender said that tender sums stand, so ArchX left the price as submitted, flagged the £1,000 error and had it referred back to the tenderer to confirm or withdraw.
How does it compare a tender that leaves work out?
For comparison only, it adds the missing items at the median of the other tenderers’ prices and shows the adjusted figure next to the submitted one. The report says which figure is which.
What goes into a tender report?
In this run, six pages for the clients: the recommendation with its condition, the three tenders as submitted, adjusted and ranked, the checks behind them and a decision box to sign. The comparison spreadsheet comes with it.
Which files do I get?
The tender report as PDF and as an editable Word document, and the comparison as an Excel spreadsheet, saved in the project folder.
Does this work if we draw in Revit, Vectorworks or AutoCAD?
Yes. No CAD file goes in: the input is the tenders as they came back, in Excel and PDF. It makes no difference whether the practice draws in Revit, Vectorworks, AutoCAD, Archicad, Allplan or SketchUp.