A brief in.
Cost plan out.Construction cost estimate from a plan and the firm’s prior rates
A construction cost estimate prices measured work from drawings using documented rates and allowances. For a rear kitchen addition at Stage 3 in England, ArchX measured the drawing, used 13 rates from the firm’s earlier estimate and wrote a seven-page cost plan for the clients in 7 minutes 47 seconds. The whole-project budget came to £123,805 including VAT.
The run in the video used the England edition of ArchX, with English terms, rules and pounds. For firms in the U.S., ArchX has its own edition with U.S. terms, units and rules.
What goes in.
The brief, the plan of the ground floor (first floor in U.S. usage) at 1:50 and the firm’s 2025 cost plan for a similar extension at 14 Elm Road. The request was one message: a Stage 3 cost plan with our own rates brought up to today, as a spreadsheet and a PDF for the clients.
What ArchX does.
- 01
Checks the scale, then measures
The 4.00 m dimension measures 4.000 m at 1:50. Inside the walls the extension is 3.40 × 3.30 m = 11.22 m², as the room label says.
- 02
Uses the firm’s rates
13 rates come from Elm Road, uplifted 6%. The rooflights (skylights) were £1,650 each there and are £1,749 now.
- 03
Prices forward
Preliminaries (general conditions) 18%, overhead and profit 8%, then inflation of 1.25% to the March 2027 tender (bid) and 0.75% to mid-build.
- 04
Adds what else the clients pay
15% risk held by the clients, fees, surveys, charges and the kitchen they buy, with VAT on each part at its own rate.
What comes back.
- Cost plan for the clients as PDF, seven pages, with quantity, rate and basis on every line
- The same cost plan as Excel and Word
- For the firm only, a spreadsheet of where each quantity and rate comes from
The figures from the run.
working time for one request
gross internal area, measured and checked against the room label
rates from the firm’s earlier cost plan, uplifted 6%
whole-project total including VAT
What stays with you.
The cost plan is a draft you check before it goes to the clients. It names what is open: the kitchen quotation, the structural and drainage design, assumed heights and the agreed fees. Piling, major sewer diversion and asbestos removal are excluded. The 6% uplift is an estimating judgment, not an index calculation.
Where the video comes from.
A recorded run of the ArchX England edition on October 31, 2026 (blind-test task gb-k01-cost-plan). The project is a test project: brief, drawing and Elm Road cost plan were invented for it. The video shows this run, re-staged and sped up.
What the video says.
The video has music and no voice. This is the text that appears on screen, in the order of the video.
- A brief in. Cost plan out.
- A brief, one drawing, an old cost plan
- Put together a Stage 3 cost plan for the Patels’ rear kitchen extension. Use our own rates from the Elm Road cost plan, brought up to today. A PDF for the clients, total including VAT.
- Reads the brief. A rear kitchen extension. Flat roof, two rooflights, bifold doors; on site from May 2027.
- Checks the drawing scale. Scale 1:50 checked. The 4.00 m dimension measures 4.000 m on the drawing.
- Measures on the drawing. 11.22 m² measured. 3.40 × 3.30 m inside the walls, the same as the room label.
- Reads the practice’s earlier rates. The practice’s own rates. Elm Road cost plan of 2025: 13 rates used, brought up 6% to today.
- Calculates the cost plan. Inflation and risk on top. To the March 2027 tender and mid-build; risk held by the clients.
- Writes the cost plan. A cost plan the clients can read. Seven pages, each checked, plus the spreadsheet and Word.
- Worked for 7 min 47 s
- Prepared the Stage 3 cost plan, totalling £123,805 including VAT. I used 13 rates from the Elm Road cost plan, uplifted 6%. The measured 11.22 m² GIA agrees with drawing 101.
- A Stage 3 cost plan, written for the clients. The whole project, VAT included. Cost summary by NRM 1 element, with £/m². £1,749: the practice’s £1,650 plus 6%. VAT and what is left out, in plain words. Seven pages as PDF and Word, plus Excel.
- 8 minutes. From a brief and a drawing to a Stage 3 cost plan. Real run: 7 min 47 s. Priced with the practice’s own rates.
- Real ArchX run, re-staged and sped up. Test project.
Which program it needs.
The run started from drawings as PDF. Revit, Vectorworks, AutoCAD, Archicad, Allplan and SketchUp all print drawings to PDF, so a practice in any of them gives ArchX the same kind of file. The video itself shows none of these programs.
Explained briefly.
- Cost plan
- A breakdown of the expected cost at a design stage. In this run the cost plan included the forecast contractor price, client-held risk, fees and items the clients would buy themselves.
- Rate basis
- The source or assumption behind a unit price. This workbook distinguishes the firm’s own past rates from allowances that still need confirmation.
Asked briefly.
How do you prepare a construction cost estimate from drawings?
ArchX checked the plan scale, measured the addition and recorded the quantity, rate and basis on each line. It used the firm’s rates from a similar job and carried the relevant allowances, fees and VAT into the project budget.
Is the total a tender price?
No. It is a whole-project budget at the base date: the forecast builder’s price of £66,613 excluding VAT, plus client-held risk, fees, the clients’ own purchases and VAT.
How do I see which rates are mine?
Every line of the breakdown carries a basis code: P (practice) for your firm’s own rates, A for an allowance still to be confirmed.
Does this work if we draw in Revit, Vectorworks or AutoCAD?
Yes. The run started from drawings as PDF. Revit, Vectorworks, AutoCAD, Archicad, Allplan and SketchUp all print drawings to PDF, so a practice in any of them gives ArchX the same kind of file. The video itself shows none of these programs.