The neighbors in.
Eight notices out.Party wall notice drafts and notice periods for work in England
A party wall notice in England tells adjoining owners about proposed work covered by the Party Wall etc. Act 1996. From the neighboring owners’ details and the engineer’s note, ArchX assessed which sections applied to three situations, who should receive a notice and the notice periods. It prepared eight notices as Word and PDF in 8 minutes 18 seconds, one ready for dates and signatures and seven drafts listing the missing details.
The run in the video used the England edition of ArchX, with English terms, rules and pounds. For firms in the U.S., ArchX has its own edition with U.S. terms, units and rules.
What goes in.
The owners of Nos. 12 and 16 from the title registers, and the engineer’s note on beam S1 and the 1.0 m deep foundations. The request set out three situations, the third a loft conversion (attic conversion) at 7 Mill Terrace, and asked for notices ready to sign.
What ArchX does.
- 01
The beam
Pocketing S1 into the party wall with No. 12: a party structure notice under section 3, two months.
- 02
The new wall
Built wholly on the clients’ land: a line of junction notice under section 1(5), one month.
- 03
The excavations
No. 16 is 2.0 m away with footings about 0.6 m deep, so the 1.0 m foundations need a notice under section 6(1), one month. ArchX adds one for No. 12, beside the same foundations.
- 04
Mill Terrace
Four owners, the long leaseholders included. The tenant on a six-month tenancy is not an owner for these notices.
What comes back.
- Party structure notice to No. 12 as PDF and Word, ready for dates and signatures
- Seven drafts as PDF and Word, with the missing facts in brackets
- Each notice with a cover letter explaining the 14 days to reply and a response form
The figures from the run.
working time for one request
notices: one to sign, seven drafts
for the party wall work, one month for the wall and the excavations
What stays with you.
The drafts name their gaps: a wall height of 3,100 mm on the plan and 3,300 mm in the section, the engineer’s decision on underpinning, the building owner’s details at Mill Terrace. Service and start dates stay blank until fixed. You check every notice before it is served. Nothing has been served.
Where the video comes from.
A recorded run of the ArchX England edition on October 12, 2026 (test job S2, third request). The project is a test project with fictitious owners. The video shows this run, re-staged and sped up.
What the video says.
The video has music and no voice. This is the text that appears on screen, in the order of the video.
- The neighbours in. Eight notices out.
- Who owns next door, from the title registers
- Party wall, three situations: which sections of the Party Wall etc. Act 1996 apply, which notices, the notice periods and who must be served? Prepare the notices as documents ready to sign.
- Reads the owner references. Two neighbours, three owners. No. 12 has one owner, No. 16 has two, from the title registers.
- Reads the engineer's note. A beam into the party wall. Foundations 1.0 m deep, next door’s footings about 0.6 m.
- Screens the Party Wall Act. The beam: section 3, two months. A party structure notice to Mr C. Example at No. 12.
- Checks the excavations. Deeper, within 3 m: section 6. Excavation notices to No. 16 and No. 12, one month each.
- Verifies section 20 ownership. Four owners, not the tenant. 7 Mill Terrace: long leaseholders count, the tenant does not.
- Prepares eight document files. Letter, notice, response form. Eight notices in Word and PDF, dates left for service.
- Worked for 8 min 18 s
- Prepared eight notices in Word and PDF, each with a covering letter and response form. The S1 beam notice is ready for dates and signatures; the other seven are drafts. Nothing has been served.
- Party structure notice, ready to sign. The work: beam S1 pocketed into the wall. A covering letter that explains the 14 days. A response form for the neighbour to sign. Drafts name the gap: 3,100 or 3,300 mm? Eight notices: one to sign, seven drafts.
- 8 minutes. Eight party wall notices, with letters and forms. Real run: 8 min 18 s. One ready to sign, seven drafts with the gaps named.
- Real ArchX run, re-staged and sped up. Fictitious test project.
Explained briefly.
- Party structure notice
- The notice used for work to an existing party structure in the test. Here it covered pocketing a beam into the wall shared with No. 12, with two months’ notice.
- Line of junction notice
- The notice used for the proposed wall along the boundary in this England run. The assessment recorded that the wall would be wholly on the clients’ land.
Asked briefly.
What goes into a party wall notice?
In this England test, ArchX identified the adjoining owners, the work covered, the applicable section of the Act and the notice period. Each draft came with a cover letter and response form.
Does the tenant get a notice?
Not in this run. The notice goes to the long leaseholder; the tenant’s rights as occupier still matter for access.
When could the work start?
With valid notices served on October 12, 2026: from November 12 for the wall and the excavations, from December 12 for the party wall work, subject to any dispute being resolved.
Does this work if we draw in Revit, Vectorworks or AutoCAD?
Yes. No CAD file goes in: the input is notes in a text file. It makes no difference whether the practice draws in Revit, Vectorworks, AutoCAD, Archicad, Allplan or SketchUp.
The same task on your desk.
You have seen the video.
Now try it on your files.
Download ArchX for Mac or Windows, open a project folder and give it the same task. 7 days free, without payment details.
