A drawing set in.
Every clash out.Drawing coordination and a submission checklist for a plan set
Drawing coordination checks whether plans, elevations and sections show the same dimensions and building elements. Before submission, ArchX compared seven drawings of a rear addition and found a parapet at 3.10 m on the plan and elevations but 3.30 m in section, and window W10 missing from an elevation. The review, submission checklist and sheet index took 25 minutes 6 seconds.
The run in the video used the England edition of ArchX, with English terms, rules and pounds. For firms in the U.S., ArchX has its own edition with U.S. terms, units and rules.
What goes in.
The drawing set LW-001 to LW-220, one PDF per sheet. The request: do the drawings agree, every window, door and dimension; is every sheet at a stated scale; then a validation checklist and a drawing register.
What ArchX does.
- 01
Checks the scales
All seven sheets have a stated scale and a matching scale bar, and the four plans have north points (north arrows). That passes.
- 02
Compares the heights
Parapet 3.10 m on plan and elevations, 3.30 m in the section: 200 mm to settle. The 4.00 m depth agrees on all four drawings compared.
- 03
Checks every opening
W10 and both rooflights (skylights) are missing from the elevations, and the section shows a solid wall where it cuts the bifold doors.
- 04
Checks the boundary
The coping projects 50 mm beyond the west wall, though the plan says the wall is wholly on the clients’ land. The red line (site boundary) stops about 5.50 m short of the highway (public road).
What comes back.
- Drawing consistency check as PDF, six pages, and as Excel, with corrections A01 to A08
- Validation checklist as PDF, Excel and Word, each requirement matched to a file or marked missing
- Drawing register of the seven drawings as PDF and Excel
The figures from the run.
working time for check, checklist and register
parapet conflict between the drawings
corrections listed, A01 to A08
What stays with you.
Every sheet is marked as a fictitious test drawing, and the check says these sources could not support a real submission. Who owns the land under the coping is a question for the title, so the ownership certificate stays open. The council decides validity; you correct the drawings.
Where the video comes from.
A recorded run of the ArchX England edition on October 12, 2026 (test job S1, second request). The project is a test project. The video shows this run, re-staged and sped up.
What the video says.
The video has music and no voice. This is the text that appears on screen, in the order of the video.
- A drawing set in. Every clash out.
- Seven drawings, before they go out
- Please check the drawing set before we submit: do the drawings agree with each other, every window and door, every dimension? Then a validation checklist and a drawing register. Files, please.
- Reads the seven drawings. Seven drawings read. Location and block plan, plans, elevations, section.
- Reads the text on the drawing. The plan says 3.10 m. LW-200: parapet 3100 above ground level.
- Compares the drawings. 3.10 m here, 3.30 m there. Plan and elevation say 3.10 m, section A–A says 3.30 m.
- Checks every window and door. W10 on the plan: 1,500 mm. A new window in the east wall of the extension.
- Compares plan and elevation. W10 is missing on the elevation. LW-210: the east wall of the extension has no window.
- Writes the drawing check. Written up as a schedule. Six pages, drawing by drawing, with the corrections.
- Worked for 25 min 6 s
- The set needs correction before submission. Scales, scale bars and north points pass. Main problems: the 200 mm parapet discrepancy, missing W10 and rooflights on elevations, section conflicts.
- The drawing check: correction required. Parapet 3.10 / 3.10 / 3.30 m: conflict. W10: on the plan, missing on the elevation. What to correct, drawing by drawing. A register of all seven drawings. Check, validation checklist and register.
- 25 minutes. Seven drawings checked sheet against sheet. Real run: 25 min 6 s, with validation checklist and drawing register.
- Real ArchX run, re-staged and sped up. Fictitious test drawings.
Which program it needs.
The run started from drawings as PDF. Revit, Vectorworks, AutoCAD, Archicad, Allplan and SketchUp all print drawings to PDF, so a practice in any of them gives ArchX the same kind of file. The video itself shows none of these programs.
Explained briefly.
- Drawing coordination
- A comparison of related drawings to find inconsistencies before the set is issued. This review found a parapet height conflict and openings shown differently across the set.
- Sheet index
- A list of the drawings in a set. ArchX returned the index of the seven drawings as PDF and Excel.
Asked briefly.
What should a drawing coordination review check?
In this submission set, ArchX compared wall heights, window and door locations, dimensions, scales and site boundaries across sheets. It put the discrepancies in a correction list and recorded submission requirements in a separate checklist.
Does ArchX change the drawings?
No. It lists the corrections drawing by drawing and leaves the originals unchanged.
Does the checklist give the fee?
Yes: £548 for the application, or £697 including the Planning Portal charge.
Does this work if we draw in Revit, Vectorworks or AutoCAD?
Yes. The run started from drawings as PDF. Revit, Vectorworks, AutoCAD, Archicad, Allplan and SketchUp all print drawings to PDF, so a practice in any of them gives ArchX the same kind of file. The video itself shows none of these programs.
The same task on your desk.
You have seen the video.
Now try it on your files.
Download ArchX for Mac or Windows, open a project folder and give it the same task. 7 days free, without payment details.
