Inspection notes in.
Snagging list out.Punch list and closeout document checklist from inspection notes
A punch list turns inspection notes into a numbered list of items the contractor still needs to address. From notes on a rear addition due to finish February 26, 2027, ArchX drafted a seven-item punch list and a closeout checklist of 20 documents for the clients. It flagged that the FENSA certificate in the notes did not cover the windows and doors installed in this new addition in England.
The run in the video used the England edition of ArchX, with English terms, rules and pounds. For firms in the U.S., ArchX has its own edition with U.S. terms, units and rules.
What goes in.
A text file with the notes of the inspection on February 22, 2027: seven snags in one line each and the handover documents received so far. The request asked for the snagging list and a handover checklist of the documents the clients should receive. It also asked for the completion certificate and advice on the late finish, which the video leaves out.
What ArchX does.
- 01
Numbers the snags
S01 to S07, each with location, action and who does it. The 1.2 m plaster crack becomes S02: check the cause first, then repair and redecorate.
- 02
Sets one target date
The contractor’s notified completion date, February 26, 2027, with a note that it was not recorded as agreed at the inspection.
- 03
Builds the handover checklist
The notes name three documents received and five to come. The checklist has 20, each received, outstanding or to check, with its rule where there is one.
- 04
Flags one catch
The notes record a FENSA certificate for doors D10 and window W10. FENSA does not cover installations in new extensions, so the checklist asks to confirm both through the completion process of building control (the building inspection authority).
What comes back.
- Snagging list for the contractor as PDF, two pages
- Client handover checklist as PDF, four pages, with the status and basis of each document
- Both as editable Word documents
The figures from the run.
working time for the whole request, including the parts the video leaves out
snags on the list, all open
documents on the checklist: 3 received, 9 outstanding, 8 to check
What stays with you.
Both lists are drafts. You decide which snags can be carried past practical completion under the contract, agree the target date with the contractor and check that documents marked received are really in hand: their status comes from your notes. Nothing is sent to anyone.
Where the video comes from.
A recorded run of the ArchX England edition on October 12, 2026 (test job S4, third request of the conversation). The project is a test project with a fictitious contractor and clients. The video shows this run, re-staged and sped up.
What the video says.
The video has music and no voice. This is the text that appears on screen, in the order of the video.
- Inspection notes in. Snagging list out.
- Notes from the pre-completion inspection
- The contractor says they will finish on 26 February 2027. Prepare the snagging list for the contractor and a handover checklist of the documents the clients should receive.
- Reads the inspection notes. Seven snags in the notes. Doors, plaster, rooflight, lights, mastic, patio, fence.
- Prepares the snagging list. Numbered, by location. Each snag with the action and who puts it right.
- Prepares the document. A note becomes an instruction. The crack: find its cause first, then repair and redecorate.
- Reviews the handover evidence. Three documents in, five to come. The five still to come are tracked as outstanding.
- Checks the handover requirements. What the clients should receive. 20 documents, each received, outstanding or to check.
- Searches the web. FENSA does not cover the extension. Doors D10 and window W10 need cover through building control.
- Views the finished pages. Every page looked at again. Crowded cells in two tables found and corrected.
- Worked for 9 min
- Seven-item snagging list SNG-01 and client handover checklist HOL-01, as PDF and Word. Nothing has been sent. The checklist also flags that FENSA does not cover glazing in new extensions.
- Snagging list for the contractor. Seven items, each with who puts it right. Handover checklist, with the rule for each. Two documents, six pages, PDF and Word.
- 7 snags. From inspection notes to a list for the contractor. Plus a handover checklist of 20 documents for the clients.
- Real ArchX run, re-staged and sped up. Test project.
Explained briefly.
- Punch list
- A numbered record of remaining work or defects to address before or around completion. Here the inspection notes yielded seven open items assigned to the contractor.
- Closeout checklist
- A list that tracks the documents the client should receive at handover. In this run it recorded the status of each document and identified what needed confirmation through England’s building control process.
Asked briefly.
What should a construction punch list include?
The list from this inspection gives each item a number, location, required action, responsible party and target date. For the plaster crack, it calls for checking the cause before repair.
What goes on a construction closeout checklist?
The checklist in this run tracks the documents the clients should receive and marks each one received, outstanding or needing verification. The status came from the inspection notes.
Do the 9 minutes cover only these two lists?
No. The same request also produced the certificate of practical completion and advice on the late finish.
Which files do I get?
Both lists as PDF and as editable Word documents, saved in the project folder.
Does this work if we draw in Revit, Vectorworks or AutoCAD?
Yes. No CAD file goes in: the input is notes in a text file. It makes no difference whether the practice draws in Revit, Vectorworks, AutoCAD, Archicad, Allplan or SketchUp.