Site photos in.
Site report out.Site observation report and contractor actions from site photos
A site observation report records what the architect saw on site and gives the contractor a list of follow-up actions. In this test, ArchX sorted eight photos from two site visits, excluded two unrelated photos and corrected a photo’s time using GPS data. It drafted field report No. 3 with six dated photos and two actions for the contractor in 4 minutes 3 seconds.
The run in the video used the England edition of ArchX, with English terms, rules and pounds. For firms in the U.S., ArchX has its own edition with U.S. terms, units and rules.
What goes in.
Eight photos in two folders, one per visit on October 20 and 22, 2026, from a phone and the office camera. The request was one message: site visit report no. 3 from my visits, not all photos are from this job, list the contractor’s actions and say where the work stands.
What ArchX does.
- 01
Sorts the photos
One site board (project sign) reads Project 2390, a different site about 5 km away by its GPS position. That photo stays out, and so does a private birthday picture.
- 02
Checks the camera clocks
The office camera ran exactly one hour behind the GPS time stored in the photo, so ArchX corrects photo 4 from 8:40 a.m. to 9:40 a.m.
- 03
Describes what the photos show
Each photo gets a date, a location and an observation. Standing water beside the same wall mark on both visits becomes one observation.
- 04
Writes the actions
A1: cap or cover the exposed starter bars (rebar dowels). A2: remove the water, find its source and agree the remedy. Each with a timing and the evidence to close it.
What comes back.
- Site visit report as PDF, five pages: progress per visit, the actions and the six photos, each dated and described
- The same report as an editable Word document
- The contractor action list as an Excel spreadsheet
The figures from the run.
working time for one request
photos placed, dated and described
camera clock error, corrected
actions for the contractor, both open
What stays with you.
The report is a draft you read before sending. ArchX names what is open: the site board names a different architect from the firm in your profile, locations are descriptive because the photos show no room, level or grid references, and the photos do not establish where the water comes from.
Where the video comes from.
A recorded run of the ArchX England edition on November 1, 2026 (blind-test task gb-fotos-01-site-visit-report). The project is a test project with synthetic photos and fictitious parties. The video shows this run, re-staged and sped up.
What the video says.
The video has music and no voice. This is the text that appears on screen, in the order of the video.
- Site photos in. Site report out.
- Eight photos from two site visits
- Could you put together site visit report no. 3 from my visits on 20 and 22 October? Photos are in the Photos folder, not all from this job. List the contractor’s actions and say where the works are.
- Takes in the photos. Eight photos, two site visits. From the phone and the office camera, 20 and 22 October.
- Looks at the photos. One photo is from another site. Its board reads Project 2390, Kirkstall Road Housing.
- Assigns the photos. Six photos in, two left out. Left out: the photo from another site and a private picture.
- Checks the camera clocks. Office camera an hour behind. The GPS time shows it: photo 4 was taken at 9:40am, not 8:40am.
- Records observations. Standing water, on both visits. Same slab, same wall mark: the contractor must find the source.
- Writes the site report. Site visit report no. 3. Five pages: progress, actions and six photos, dated and described.
- Worked for 4 min 3 s
- Prepared report no. 3. Six photos are included; one unrelated-site photo and one private photo were excluded. Photo 4’s office-camera time was corrected to 9:40am. Both contractor actions remain open.
- Site visit report no. 3, five pages. Where the works have got to, per visit. Each photo placed, dated and described. What the contractor must do, and by when. Five pages as PDF and Word, actions in Excel.
- 6 of 8 photos. Sorted, dated, described. Report written in 4 minutes. Real run: 4 min 3 s. One photo from another site and one private picture left out.
- Real ArchX run, re-staged and sped up. Test project, synthetic photos.
Explained briefly.
- Field report
- A record of observations from a site visit. The field report in this test uses dated photos to show what was observed and tracks the contractor’s follow-up separately.
- Contractor action list
- A list of next steps assigned to the contractor, with timing and closeout evidence. In this run it included covering exposed rebar dowels and investigating standing water.
Asked briefly.
What should a site observation report include?
This field report included a dated record of progress by visit, photos with locations and observations, and a list of contractor actions with timing and evidence needed to close them.
How does ArchX tell that a photo is from another site?
From what it shows and where it was taken: here a site board with another project number, and a GPS position about 5 km away.
Which files do I get?
The report as PDF and Word and the action list in Excel, saved in the project folder.
Does this work if we draw in Revit, Vectorworks or AutoCAD?
Yes. No CAD file goes in: the input is site photos. It makes no difference whether the practice draws in Revit, Vectorworks, AutoCAD, Archicad, Allplan or SketchUp.
The same task on your desk.
You have seen the video.
Now try it on your files.
Download ArchX for Mac or Windows, open a project folder and give it the same task. 7 days free, without payment details.