Site photos.
Sorted into the field report.

ArchX sorts site photos by date, location and element, describes what they show and writes the field report.

Extract from page 1: work in progress per visit, remarks and GC action item A1 with closeout evidence

What goes in.

You

I walked the … site (our project 2417, …) on Oct 20 and again on Oct 22. All the photos are in the Photos folder – it's basically my phone's camera roll plus a few from Mike's Sony, so there may be other stuff mixed in. Please put together Site Observation Report No. 3 for the owner and the GC from both visits: observations with the photos, action items for anything the contractor needs to fix, and where the work stands. Owner is Example Owner LLC, GC is Sample Builders LLC; distribution goes to both.

Files

  • Photos/2026-10-20 Site visit/DSC09021.JPG
  • Photos/2026-10-20 Site visit/IMG_4101.JPG
  • Photos/2026-10-20 Site visit/IMG_4102.JPG
  • Photos/2026-10-20 Site visit/IMG_4103.JPG
  • Photos/2026-10-20 Site visit/IMG_4104.JPG
  • Photos/2026-10-20 Site visit/IMG_4105.JPG
  • Photos/2026-10-22 Site visit/IMG_4131.JPG
  • Photos/2026-10-22 Site visit/IMG_4132.JPG

Test project: Blind-test task: eight synthetic site images (EXIF 'synthetic fixture'), including a private picture and one from another project; fictitious parties (Example Owner LLC, Sample Builders LLC); report issued as 'Trinity Street Architects (fictitious)'.

What ArchX gives back.

Extract from page 1: work in progress per visit, remarks and GC action item A1 with closeout evidence
Extract from page 1: work in progress per visit, remarks and GC action item A1 with closeout evidence
Photo page of the report: photos 3 and 4 with date, location and observation
Photo page of the report: photos 3 and 4 with date, location and observation

From the answer

Prepared Site Observation Report No. 3 with six photos, four observations, and two open GC action items. Example Owner LLC and Sample Builders LLC are listed for distribution.

Saved files

  • SOR 03 ….pdf – Site Observation Report No. 3, 5 pages: work in progress, remarks, GC action items and six annotated photos
  • SOR 03 ….docx – Editable Word report
  • SOR 03 … Action Items.xlsx – Excel action items and photo log

Measured, not estimated.

4 min 42 s

ArchX working time for this brief, measured.

Run of November 1, 2026

six photos

placed, dated and described in the report (out of eight in the folder)

Run of November 1, 2026

four observations

written up from both site visits

Run of November 1, 2026

two open GC action items

for the general contractor, with proposed timing and closeout evidence

Run of November 1, 2026

How to.

Put the photos of a site visit in the project folder and ask for the field report. Try ArchX free for 7 days with a task from your own firm.