Bids.
Leveled on the same scope.
ArchX checks every bid against your Instructions to Bidders, values left-out scope for comparison only and turns exclusions into questions.

What goes in.
You
Bids for the Suite 210 TI are in (folder 'Bids received'). Please level the three GC bids against our Instructions to Bidders, tell me who the low responsive bidder is, and draft a bid recommendation letter to the owner, Example Avenue Office Partners. I need the bid tab as a spreadsheet.
Files
- Bid -
Example Contractor A. pdf - Bid -
Example Contractor B. pdf - Bid -
Example Contractor C. pdf - Instructions to Bidders.
pdf
Test project: U.S., with planted errors. A fictitious tenant improvement in Dallas, a fictitious firm and owner and three contractors named Example. One run with ChatGPT Pro (GPT 6.1 Sol, very high) and the code of ArchX 0.1.4.
What ArchX gives back.



From the answer
Example Contractor A LLC (fictitious) is the apparent low responsive bidder at $412,600, subject to verifying its stated 5% bid bond.
B’s comparison total is $436,266.75, adding $32,166.75 tax and an assumed $14,200 tax-inclusive sprinkler allowance.
C is $11,350 below A. Its $9,000 informational SOV discrepancy does not change its Base Bid. Considering C requires permitted owner waiver of the alternate omission, no acceptance of that alternate, and no competitive advantage.
A with Alternate No. 1 totals $431,000. The draft also flags the missing bond documents and the stated November 20, 2026 bid deadline, which is later than this November 7 review.
Saved files
- Bid Leveling.
xlsx – The bid tab with submitted, checked and leveled totals, comparison plugs and their basis - Bid Leveling Summary DRAFT.
docx – Three bids side by side, alternates carried separately, the plug table - Bid Evaluation Report DRAFT.
docx – The detailed evaluation of each bid - Letter to Owner -
Bid Recommendation DRAFT. – Recommendation letter to the owner, as a draftdocx
Measured, not estimated.
ArchX working time for this brief, measured.
Run of November 7, 2026
is the estimated comparison amount for the lowest bid, $389,900, once the sprinklers and sales tax it excluded are in, with the basis shown
Run of November 7, 2026
the apparent low responsive bidder, subject to its bond. The lowest bid has four exceptions; the other lower bid left a mandatory alternate unpriced, which the owner may waive only if the documents allow it
Run of November 7, 2026
gap between one bid's stated base bid, $401,250, and its own schedule of values, $410,250, flagged; it does not change the base bid
Run of November 7, 2026
How to.
Put the bids and the bid form in the project folder and ask ArchX to level them. Try ArchX free for 7 days with a task from your own firm.