Excavation.
Cubic yards from two surveys.

ArchX works out the dig from point clouds or drawings: volume, truckloads and the pay line, shown in 3D.

Page 1 of the owner's rep report: 3,690 CY cut, pay boundary, equipment check, billing reconciliation and cut-depth plan

What goes in.

You

We have two drone scans of the pit for Building A at Elm Street: existing-2026-03-02.las (before) and excavated-2026-09-15.las (after; the excavator was still parked in the pit). How many cubic yards came out? The excavation sub is billing more than we think, so I need a report for the owner's rep. The shoring is roughly …

Files

  • existing-2026-03-02.las
  • excavated-2026-09-15.las

Test project: Blind-test task 0.0.91: two synthetic drone point clouds (LAS header 'ArchX synthetic fixture') of a fictitious pit for 'Building A, Elm Street'; report issued as 'Trinity Street Architects (fictitious)'.

What ArchX gives back.

Page 1 of the owner's rep report: 3,690 CY cut, pay boundary, equipment check, billing reconciliation and cut-depth plan
Page 1 of the owner's rep report: 3,690 CY cut, pay boundary, equipment check, billing reconciliation and cut-depth plan
Report page with sections A-A and B-B: existing grade, excavated pit and the cut area between them
Report page with sections A-A and B-B: existing grade, excavated pit and the cut area between them

From the answer

About 3,690 bank cubic yards of modeled excavation within your approximate 100′ × 66′ shoring limits.

Saved files

  • Excavation_Elm_A_Rev_1.pdf – Owner's rep report, 6 pages: quantity, pay boundary, equipment check, billing reconciliation, sections and sensitivity
  • Excavation_Elm_A_Rev_1.xlsx – Excel workbook with live formulas
  • Excavation_Elm_A_Rev_1_Audit_package.zip – Audit package: source files, point, triangle and grid files and a recompute script
  • Excavation_Elm_A_Rev_1_3D.html – Interactive 3D view of the pit
  • Excavation_Elm_A_Rev_1_Geometry.dxf – Pay boundary and geometry for CAD

Measured, not estimated.

4 min 52 s

ArchX working time for this brief, measured.

Run of November 1, 2026

3,690 CY

bank (in-place) excavation between the two drone scans

Run of November 1, 2026

86 points

excavator points removed by the ground filter before computing the volume

Run of November 1, 2026

3,632.1 CY

what the quantity would be if the excavator were counted as ground

Run of November 1, 2026

How to.

Put the surveys before and after the dig in the project folder and ask for the volume. Try ArchX free for 7 days with a task from your own firm.