Fee proposals.
Stage by stage, ready to sign.

What a fee proposal and terms of engagement need under the RIBA Plan of Work and the ARB Code, and a real fee proposal ArchX wrote from a fee basis.

What goes into an architect’s fee proposal?

The services stage by stage against the RIBA Plan of Work, the fee for each stage on your own fee basis, what is excluded, VAT, expenses and payment terms, and terms of engagement agreed in writing before work starts, as the ARB Architects Code expects. If you met private clients at their home, consumer cancellation rights apply.

What to include

A proposal the client can sign usually covers:

  • The project and the brief as you understood it.
  • Services by RIBA stage, with optional services priced separately.
  • The fee per stage, the basis (fixed, percentage or time) and VAT.
  • Exclusions, expenses, payment terms and how changes are charged.
  • Terms of engagement: responsibilities, liability and professional indemnity, termination.

Private clients met at home

A contract agreed away from your office with a consumer is an off-premises contract under the Consumer Contracts Regulations 2013: the client gets a 14-day cancellation right and the information and cancellation form the Regulations require. Work in that period needs the client’s express request.

How to do it.

  1. 01

    Read the enquiry

    Project, site, client and what they asked for.

  2. 02

    Map the services

    Services by RIBA stage, core and optional.

  3. 03

    Price on your basis

    Fees per stage from your own fee basis, with VAT and expenses.

  4. 04

    Write the terms

    Terms of engagement, liability and, for consumers, the cancellation notice.

  5. 05

    Check and send

    Read it as the client would, then send it for signature.

A real example: fee proposal and terms of engagement.

From the enquiry and the practice’s fee basis, ArchX wrote fee proposal FP-01 and terms of engagement TOE-01. Fees from the practice’s fee basis: £11,350 plus VAT, £13,620 in total, from measured survey to Building Regulations. Services by RIBA stage, Stage 1 to Stage 4. Tendering and contract administration offered as options, estimated at £7,320 including VAT.

Services and fees table of fee proposal FP-01: measured survey, brief and concept design, planning and Building Regulations by RIBA stage, totalling £11,350 excluding VAT and £13,620 including VAT.
Services and fees table of fee proposal FP-01: measured survey, brief and concept design, planning and Building Regulations by RIBA stage, totalling £11,350 excluding VAT and £13,620 including VAT.
7 min 50 s

ArchX working time, measured

England test project with a fictitious practice and fictitious clients, run of 12 October 2026. See all results

Asked briefly.

Can ArchX use our own fee basis?

Yes. Put your fee basis in the project folder or the practice records and ArchX prices from it, stage by stage.

Does it handle the consumer cancellation rules?

Yes. In the example the clients were met at home, so the terms carry the 14-day cancellation right, the cancellation form and an early-start request.

Who signs?

You do. ArchX drafts the proposal and the terms as Word and PDF; the practice checks, signs and sends them.

Sources, read 1 November 2026: RIBA Plan of Work · ARB Architects Code · Consumer Contracts Regulations 2013

Try it on your own work.

Download ArchX for Mac or Windows and give it a task from your practice. 7 days free with your ChatGPT account (Plus or higher).