A brief in.
Cost plan out.RIBA Stage 3 cost plan, elemental, priced with the practice’s own rates
A Stage 3 cost plan prices the design element by element at RIBA Stage 3, so the clients know what the whole project will cost before it goes to tender. In this recorded run a rear kitchen extension was at Stage 3. ArchX measured the drawing, priced the work with 13 rates from the practice’s own earlier cost plan and wrote a seven-page cost plan in 7 minutes 47 seconds: £123,805 including VAT.
What goes in.
The brief, the ground floor plan at 1:50 and the practice’s 2025 cost plan for a similar extension at 14 Elm Road. The request was one message: a Stage 3 cost plan with our own rates brought up to today, as a spreadsheet and a PDF for the clients.
What ArchX does.
- 01
Checks the scale, then measures
The 4.00 m dimension measures 4.000 m at 1:50. Inside the walls the extension is 3.40 × 3.30 m = 11.22 m², as the room label says.
- 02
Uses the practice’s rates
13 rates come from Elm Road, uplifted 6%. The rooflights were £1,650 each there and are £1,749 now.
- 03
Prices forward
Preliminaries 18%, overheads and profit 8%, then inflation of 1.25% to the March 2027 tender and 0.75% to mid-build.
- 04
Adds what else the clients pay
15% risk held by the clients, fees, surveys, charges and the kitchen they buy, with VAT on each part at its own rate.
What comes back.
- Cost plan for the clients as PDF, seven pages, with quantity, rate and basis on every line
- The same cost plan as Excel and Word
- For the practice only, a spreadsheet of where each quantity and rate comes from
The figures from the run.
working time for one request
gross internal area, measured and checked against the room label
rates from the practice’s earlier cost plan, uplifted 6%
whole-project total including VAT
What stays with you.
The cost plan is a draft you check before it goes to the clients. It names what is open: the kitchen quotation, the structural and drainage design, assumed heights and the agreed fees. Piling, major sewer diversion and asbestos removal are excluded. The 6% uplift is an estimating judgement, not an index calculation.
Where the video comes from.
A recorded run of the ArchX England edition on 31 October 2026 (blind-test task gb-k01-cost-plan). The project is a test project: brief, drawing and Elm Road cost plan were invented for it. The video shows this run, re-staged and sped up.
What the video says.
The video has music and no voice. This is the text that appears on screen, in the order of the video.
- A brief in. Cost plan out.
- A brief, one drawing, an old cost plan
- Put together a Stage 3 cost plan for the Patels’ rear kitchen extension. Use our own rates from the Elm Road cost plan, brought up to today. A PDF for the clients, total including VAT.
- Reads the brief. A rear kitchen extension. Flat roof, two rooflights, bifold doors; on site from May 2027.
- Checks the drawing scale. Scale 1:50 checked. The 4.00 m dimension measures 4.000 m on the drawing.
- Measures on the drawing. 11.22 m² measured. 3.40 × 3.30 m inside the walls, the same as the room label.
- Reads the practice’s earlier rates. The practice’s own rates. Elm Road cost plan of 2025: 13 rates used, brought up 6% to today.
- Calculates the cost plan. Inflation and risk on top. To the March 2027 tender and mid-build; risk held by the clients.
- Writes the cost plan. A cost plan the clients can read. Seven pages, each checked, plus the spreadsheet and Word.
- Worked for 7 min 47 s
- Prepared the Stage 3 cost plan, totalling £123,805 including VAT. I used 13 rates from the Elm Road cost plan, uplifted 6%. The measured 11.22 m² GIA agrees with drawing 101.
- A Stage 3 cost plan, written for the clients. The whole project, VAT included. Cost summary by NRM 1 element, with £/m². £1,749: the practice’s £1,650 plus 6%. VAT and what is left out, in plain words. Seven pages as PDF and Word, plus Excel.
- 8 minutes. From a brief and a drawing to a Stage 3 cost plan. Real run: 7 min 47 s. Priced with the practice’s own rates.
- Real ArchX run, re-staged and sped up. Test project.
Which program it needs.
The run started from drawings as PDF. Revit, Vectorworks, AutoCAD, Archicad, Allplan and SketchUp all print drawings to PDF, so a practice in any of them gives ArchX the same kind of file. The video itself shows none of these programs.
Explained briefly.
- Elemental cost plan
- A cost plan grouped by building element. Here the summary follows the RICS NRM 1 group elements, and every line of the breakdown carries quantity, rate and source.
- Uplift
- Bringing an earlier rate up to today’s prices. Here 6% from Q1 2025 to Q4 2026, an estimating judgement rather than an index calculation: the rooflight at £1,650 becomes £1,749.
- Client-held risk
- An allowance for risks that stays with the clients rather than in the builder’s price. Here 15%, £9,992.
Asked briefly.
What goes into a Stage 3 cost plan?
In this run seven pages for the clients: key figures, a cost summary by NRM 1 group element, the elemental breakdown with quantity, rate and source on every line, risk and inflation, VAT, exclusions and assumptions.
Can ArchX use my practice’s own rates?
That is what this run did: 13 rates from the practice’s 2025 cost plan for 14 Elm Road, uplifted 6%.
Is the total a tender price?
No. It is a whole-project budget at the base date: the forecast builder’s price of £66,613 excluding VAT, plus client-held risk, fees, the clients’ own purchases and VAT.
How do I see which rates are mine?
Every line of the breakdown carries a basis code: P for the practice’s own rates, A for an allowance still to be confirmed.
Does this work if we draw in Revit, Vectorworks or AutoCAD?
Yes. The run started from drawings as PDF. Revit, Vectorworks, AutoCAD, Archicad, Allplan and SketchUp all print drawings to PDF, so a practice in any of them gives ArchX the same kind of file. The video itself shows none of these programs.
The same task on your desk.
You have seen the video.
Now try it on your files.
Download ArchX for Mac or Windows, open a project folder and give it the same task. 7 days free, without payment details.