Two drone scans in.
Cubic metres out.Excavation volume calculation: cut and fill from two drone point clouds
An excavation volume calculation compares the ground surface before and after the dig over a fixed boundary: where the ground has dropped, the volume between the two surfaces is the cut. In this recorded run two drone surveys of a basement dig went in, the later one flown with the excavator still in the hole. ArchX built a ground surface from each, filtered out the excavator, measured the volume inside the piling line and wrote an 11-page report for the QS: about 2,754 m³ of in-situ excavation, after 4 minutes 57 seconds of work.
What goes in.
Two point clouds as LAS files, from 2 March and 15 September 2026. The request: how many cubic metres have actually come out, the contractor claims more, I need a report for the QS. It gave the sheet piling line as rough coordinates.
What ArchX does.
- 01
Derives the ground surfaces
The clouds carry no ground classification, so ArchX works out the ground itself and builds one triangulated surface per survey.
- 02
Filters out the excavator
A yellow object of 84 points, 3.2 m high, stands in the later survey. ArchX removes it and rebuilds the ground beneath from the surface around it.
- 03
Computes cut and fill
Over the 600.0 m² boundary from the brief: 2,754 m³ of cut, 0 m³ of fill, a mean depth of 4.59 m.
- 04
Tests what could move the figure
Moving the sides inwards takes off 28.3 m³, and a 20 mm level shift moves the cut by 12 m³ either way. Each test stands on its own, not added up into an accuracy.
What comes back.
- Quantity report for the QS as PDF, 11 pages, with the proof step by step, a difference map, sections, the gaps and the sensitivity tests
- The calculation workbook in Excel, with the sums as formulas
- Geometry as DXF, an audit package with a script that recomputes the volume, and a 3D view that ArchX marked as not verified
The figures from the run.
working time for one request
in-situ excavation within 600.0 m², with 0 m³ of fill
of it on 39.5 m² with weaker point support
What stays with you.
The figure is a model quantity, not certified for payment, and every page of the report says so. Both LAS headers name a synthetic source, so their provenance must be confirmed before the figure supports a valuation. No contractor quantity was supplied, so ArchX claims no overclaim; it lists what the QS should ask for, down to whether the claim is in loose cubic metres or tonnes.
Where the video comes from.
A recorded blind test of the ArchX England edition on 1 November 2026 (task gb-excavation-01-two-surveys), shown re-staged and sped up. The point clouds are synthetic test surveys; the project and the practice are fictitious.
What the video says.
The video has music and no voice. This is the text that appears on screen, in the order of the video.
- Two drone scans in. Cubic metres out.
- Two drone surveys, before and after
- Two drone surveys of the dig: before we started and last month (excavator still in the hole). How many cubic metres have actually come out? The contractor claims more. I need a report for the QS.
- Reads the two drone surveys. Two drone surveys. 2 March and 15 September 2026: 16,200 and 16,153 points.
- Derives the ground surfaces. The excavator filtered out. A yellow object of 84 points, 3.2 m high: removed, ground beneath rebuilt.
- Checks scope, sub-areas and design. The piling line as boundary. E 530115–530145, N 180212–180232 from the brief: 600.0 m².
- Computes cut and fill. Cut 2,754 m³, fill 0 m³. Mean depth 4.59 m over 600.0 m², existing minus excavated.
- Produces the excavation report. A report for the QS. 11 pages with the proof step by step, gaps and sensitivity tests.
- Worked for 4 min 57 s
- The supplied files model approximately 2,754 m³ of in-situ excavation. The apparent excavator has been filtered out. No contractor quantity was supplied, so an overclaim is not established.
- Quantity report for the QS, 11 pages
- 2,754 m³ cut, excavator filtered out
- Of that, 182.1 m³ on weaker point support
- Sensitivity tests, each shown on its own
- Difference map: the cut depth, cell by cell
- 11 pages, plus workbook, 3D, DXF and ZIP
- 2,754 m³. From two drone scans to a quantity the QS can check. Real run: 4 min 57 s. A model quantity, not certified for payment.
- Real ArchX run, re-staged and sped up. Synthetic test surveys.
Explained briefly.
- Cut and fill
- Cut is the volume where the later ground lies below the earlier one, fill where it lies above. Here 2,754 m³ of cut and 0 m³ of fill over 600.0 m².
- In-situ volume
- The volume of the ground as it lay before digging, not loose spoil or tonnes. The 2,754 m³ is in situ; any conversion for payment stays with the QS.
- Point cloud (LAS)
- A survey as a set of measured 3D points, here saved as LAS files. The two surveys hold 16,200 and 16,153 points, in British National Grid with heights to ODN.
Asked briefly.
How do you calculate excavation volume from drone surveys?
In this run ArchX built a triangulated ground surface from each survey, removed the excavator from the later one and integrated both surfaces exactly over the 600.0 m² boundary. Two grid checks agree within 0.054 m³.
Can the QS check the figure?
The report sets out the proof step by step, the workbook carries the sums as formulas, and the audit package recomputes the quantity from the two LAS files.
Is 2,754 m³ the quantity to pay?
Not as it stands. It is a modelled in-situ volume, not a loose or tonnage quantity, and it is not certified for payment. The payment line and any conversion stay with the QS.
Does this work if we draw in Revit, Vectorworks or AutoCAD?
Yes. No CAD file goes in: the input is two drone point clouds. It makes no difference whether the practice draws in Revit, Vectorworks, AutoCAD, Archicad, Allplan or SketchUp.