Site photos in.
Site report out.Site visit report from the photos of two visits, with the contractor’s actions

A site visit report records where the works have got to, with dated photos and the actions the contractor has to take. In this recorded run, after two site visits, eight photos sat in one folder, and not all of them were from the job. ArchX sorted them, left out two, corrected a wrong camera time and wrote site visit report no. 3 with six dated photos and two actions for the contractor, in 4 minutes 3 seconds.

What goes in.

Eight photos in two folders, one per visit on 20 and 22 October 2026, from a phone and the office camera. The request was one message: site visit report no. 3 from my visits, not all photos are from this job, list the contractor’s actions and say where the works have got to.

What ArchX does.

  1. 01

    Sorts the photos

    One site board reads Project 2390, a different site about 5 km away by its GPS position. That photo stays out, and so does a private birthday picture.

  2. 02

    Checks the camera clocks

    The office camera ran exactly one hour behind the GPS time stored in the photo, so ArchX corrects photo 4 from 8:40am to 9:40am.

  3. 03

    Describes what the photos show

    Each photo gets a date, a location and an observation. Standing water beside the same wall mark on both visits becomes one observation.

  4. 04

    Writes the actions

    A1: cap or cover the exposed starter bars. A2: remove the water, find its source and agree the remedy. Each with a timing and the evidence to close it.

What comes back.

  • Site visit report as PDF, five pages: progress per visit, the actions and the six photos, each dated and described
  • The same report as an editable Word document
  • The contractor action list as an Excel spreadsheet

The figures from the run.

4 min 3 s

working time for one request

6 of 8

photos placed, dated and described

1 hour

camera clock error, corrected

2

actions for the contractor, both open

What stays with you.

The report is a draft you read before sending. ArchX names what is open: the site board names a different architect from the practice in your profile, locations are descriptive because the photos show no room, level or grid references, and the photos do not establish where the water comes from.

Where the video comes from.

A recorded run of the ArchX England edition on 1 November 2026 (blind-test task gb-fotos-01-site-visit-report). The project is a test project with synthetic photos and fictitious parties. The video shows this run, re-staged and sped up.

What the video says.

The video has music and no voice. This is the text that appears on screen, in the order of the video.

  1. Site photos in. Site report out.
  2. Eight photos from two site visits
  3. Could you put together site visit report no. 3 from my visits on 20 and 22 October? Photos are in the Photos folder, not all from this job. List the contractor’s actions and say where the works are.
  4. Takes in the photos. Eight photos, two site visits. From the phone and the office camera, 20 and 22 October.
  5. Looks at the photos. One photo is from another site. Its board reads Project 2390, Kirkstall Road Housing.
  6. Assigns the photos. Six photos in, two left out. Left out: the photo from another site and a private picture.
  7. Checks the camera clocks. Office camera an hour behind. The GPS time shows it: photo 4 was taken at 9:40am, not 8:40am.
  8. Records observations. Standing water, on both visits. Same slab, same wall mark: the contractor must find the source.
  9. Writes the site report. Site visit report no. 3. Five pages: progress, actions and six photos, dated and described.
  10. Worked for 4 min 3 s
  11. Prepared report no. 3. Six photos are included; one unrelated-site photo and one private photo were excluded. Photo 4’s office-camera time was corrected to 9:40am. Both contractor actions remain open.
  12. Site visit report no. 3, five pages. Where the works have got to, per visit. Each photo placed, dated and described. What the contractor must do, and by when. Five pages as PDF and Word, actions in Excel.
  13. 6 of 8 photos. Sorted, dated, described. Report written in 4 minutes. Real run: 4 min 3 s. One photo from another site and one private picture left out.
  14. Real ArchX run, re-staged and sped up. Test project, synthetic photos.

Which program it needs.

No CAD file goes in: the input is site photos. It makes no difference whether the practice draws in Revit, Vectorworks, AutoCAD, Archicad, Allplan or SketchUp.

Explained briefly.

Contractor action
An instruction in the report with who does it, a timing and the evidence to close it. Here A1, cap or cover the exposed starter bars, and A2, remove the standing water and find its source.
Camera time and GPS time
A photo can store the camera’s clock and a GPS time. Here the office camera ran exactly one hour behind British Summer Time, so photo 4 moves from 8:40am to 9:40am.

Asked briefly.

What should a site visit report include?

In this run five pages: the progress of the works per visit, remarks, the actions for the contractor, a table of all photographs and the six photos, each with its date, location and observation.

Can a site visit report be written from photos alone?

Here it was, from eight photos and one request. Where the photos fall short the report says so: locations are descriptive because the photos show no room, level or grid references.

How does ArchX tell that a photo is from another site?

From what it shows and where it was taken: here a site board with another project number, and a GPS position about 5 km away.

Which files do I get?

The report as PDF and Word and the action list in Excel, saved in the project folder.

Does this work if we draw in Revit, Vectorworks or AutoCAD?

Yes. No CAD file goes in: the input is site photos. It makes no difference whether the practice draws in Revit, Vectorworks, AutoCAD, Archicad, Allplan or SketchUp.

The same task on your desk.

You have seen the video.
Now try it on your files.

Download ArchX for Mac or Windows, open a project folder and give it the same task. 7 days free, without payment details.