Inspection notes in.
Snagging list out.Snagging list from pre-completion inspection notes, plus a handover checklist

A snagging list numbers what is still wrong at the end of a job, with the location, the action and who puts it right. In this recorded run the contractor said the extension would be finished on 26 February 2027, and the notes from the pre-completion inspection listed what was still wrong. ArchX turned them into a snagging list of seven items for the contractor and a handover checklist of 20 documents for the clients, and flagged that FENSA does not cover installations in new extensions.

What goes in.

A text file with the notes of the inspection on 22 February 2027: seven snags in one line each and the handover documents received so far. The request asked for the snagging list and a handover checklist of the documents the clients should receive. It also asked for the completion certificate and advice on the late finish, which the video leaves out.

What ArchX does.

  1. 01

    Numbers the snags

    S01 to S07, each with location, action and who does it. The 1.2 m plaster crack becomes S02: check the cause first, then repair and redecorate.

  2. 02

    Sets one target date

    The contractor’s notified completion date, 26 February 2027, with a note that it was not recorded as agreed at the inspection.

  3. 03

    Builds the handover checklist

    The notes name three documents received and five to come. The checklist has 20, each received, outstanding or to check, with its rule where there is one.

  4. 04

    Flags one catch

    The notes record a FENSA certificate for doors D10 and window W10. FENSA does not cover installations in new extensions, so the checklist asks to confirm both through building control’s completion process.

What comes back.

  • Snagging list for the contractor as PDF, two pages
  • Client handover checklist as PDF, four pages, with the status and basis of each document
  • Both as editable Word documents

The figures from the run.

9 min

working time for the whole request, including the parts the video leaves out

7

snags on the list, all open

20

documents on the checklist: 3 received, 9 outstanding, 8 to check

What stays with you.

Both lists are drafts. You decide which snags can be carried past practical completion, agree the target date with the contractor and check that documents marked received are really in hand: their status comes from your notes. Nothing is sent to anyone.

Where the video comes from.

A recorded run of the ArchX England edition on 12 October 2026 (test job S4, third request of the conversation). The project is a test project with a fictitious contractor and clients. The video shows this run, re-staged and sped up.

What the video says.

The video has music and no voice. This is the text that appears on screen, in the order of the video.

  1. Inspection notes in. Snagging list out.
  2. Notes from the pre-completion inspection
  3. The contractor says they will finish on 26 February 2027. Prepare the snagging list for the contractor and a handover checklist of the documents the clients should receive.
  4. Reads the inspection notes. Seven snags in the notes. Doors, plaster, rooflight, lights, mastic, patio, fence.
  5. Prepares the snagging list. Numbered, by location. Each snag with the action and who puts it right.
  6. Prepares the document. A note becomes an instruction. The crack: find its cause first, then repair and redecorate.
  7. Reviews the handover evidence. Three documents in, five to come. The five still to come are tracked as outstanding.
  8. Checks the handover requirements. What the clients should receive. 20 documents, each received, outstanding or to check.
  9. Searches the web. FENSA does not cover the extension. Doors D10 and window W10 need cover through building control.
  10. Views the finished pages. Every page looked at again. Crowded cells in two tables found and corrected.
  11. Worked for 9 min
  12. Seven-item snagging list SNG-01 and client handover checklist HOL-01, as PDF and Word. Nothing has been sent. The checklist also flags that FENSA does not cover glazing in new extensions.
  13. Snagging list for the contractor. Seven items, each with who puts it right. Handover checklist, with the rule for each. Two documents, six pages, PDF and Word.
  14. 7 snags. From inspection notes to a list for the contractor. Plus a handover checklist of 20 documents for the clients.
  15. Real ArchX run, re-staged and sped up. Test project.

Which program it needs.

No CAD file goes in: the input is notes in a text file. It makes no difference whether the practice draws in Revit, Vectorworks, AutoCAD, Archicad, Allplan or SketchUp.

Explained briefly.

Snagging
Putting right the defects found near completion. Here seven snags, from a door that binds to a damaged fence, numbered S01 to S07.
Practical completion
The point at which the works are certified complete under the contract, here JCT Minor Works 2024. You decide which minor snags can be carried past it.
FENSA
A certificate scheme for windows and doors. The checklist points out that it does not cover installations in new extensions, so doors D10 and window W10 go through building control’s completion process.

Asked briefly.

What goes on a snagging list?

In this run each of the seven items has a reference from S01 to S07, a location, the work to be done, who does it and a status, followed by the close-out rules.

Which documents should the clients get at handover?

The checklist in this run lists 20, each marked received, outstanding or to check, with the rule behind it where there is one, such as the Building Regulations 2010, CDM 2015 or the Party Wall etc. Act 1996.

Do the 9 minutes cover only these two lists?

No. The same request also produced the certificate of practical completion and advice on the late finish.

Which files do I get?

Both lists as PDF and as editable Word documents, saved in the project folder.

Does this work if we draw in Revit, Vectorworks or AutoCAD?

Yes. No CAD file goes in: the input is notes in a text file. It makes no difference whether the practice draws in Revit, Vectorworks, AutoCAD, Archicad, Allplan or SketchUp.