Drawing review.
Clashes found before site.
ArchX lays drawings over each other, finds what contradicts or is missing and marks it with its source.

What goes in.
You
The structural engineer has issued their GA for the ground floor walls and first floor slab (folder 'Structural'). Could you check it against our ground floor plan EXA-ZZ-00-DR-A-1100 rev P04 in 'Architect'? We were expecting SSL-ZZ-00-DR-S-2100 at revision P03. Please mark up the GA with numbered comments (our value vs theirs), give me a comments sheet I can send back, and propose a status A, B or C.
Files
- SSL-
ZZ- 00- DR- S- 2100_ P02_ GA_ GF. pdf - EXA-
ZZ- 00- DR- A- 1100_ P04_ Ground_ Floor_ Plan. pdf
Test project: Synthetic test project from the 0.0.91 blind evaluation: a small office building with a fictitious structural engineer (“Sample Structures LLP”) and sample drawing numbers.
What ArchX gives back.


From the answer
Proposed status C — not accepted; revise and resubmit. Nine comments address revision, dimension, wall, doorway, slab-level and penetration coordination.
Saved files
- SSL-
ZZ- – Marked-up GA and comments sheet, A3, 3 pages: numbered red comments (ours vs theirs) and proposed status00- DR- S- 2100_ P02_ GA_ GF_ Marked- up. pdf - SSL-
ZZ- – Editable comments sheet with response columns for the engineer00- DR- S- 2100_ P02_ GA_ GF_ Comment sheet. xlsx - Document register.
xlsx – Document register updated with the received drawing
Measured, not estimated.
ArchX working time for this brief, measured.
Run of 1 November 2026
numbered comments, each with our value against theirs
Run of 1 November 2026
north dimension string re-added: it does not close to the stated overall
Run of 1 November 2026
wrong revision received picked up before any dimension was checked
Run of 1 November 2026
How to.
Put the drawings in the project folder and say what should be checked against what. Try ArchX free for 7 days with a task from your own practice.