Drawing review.
Clashes found before site.

ArchX lays drawings over each other, finds what contradicts or is missing and marks it with its source.

Structural GA marked up: checked dimensions ticked in green, discrepancies crossed in red and numbered 003 to 009

What goes in.

You

The structural engineer has issued their GA for the ground floor walls and first floor slab (folder 'Structural'). Could you check it against our ground floor plan EXA-ZZ-00-DR-A-1100 rev P04 in 'Architect'? We were expecting SSL-ZZ-00-DR-S-2100 at revision P03. Please mark up the GA with numbered comments (our value vs theirs), give me a comments sheet I can send back, and propose a status A, B or C.

Files

  • SSL-ZZ-00-DR-S-2100_P02_GA_GF.pdf
  • EXA-ZZ-00-DR-A-1100_P04_Ground_Floor_Plan.pdf

Test project: Synthetic test project from the 0.0.91 blind evaluation: a small office building with a fictitious structural engineer (“Sample Structures LLP”) and sample drawing numbers.

What ArchX gives back.

Structural GA marked up: checked dimensions ticked in green, discrepancies crossed in red and numbered 003 to 009
Structural GA marked up: checked dimensions ticked in green, discrepancies crossed in red and numbered 003 to 009
Review panel on the marked-up GA: nine comments with ours and theirs, and proposed status C – not accepted, revise and resubmit
Review panel on the marked-up GA: nine comments with ours and theirs, and proposed status C – not accepted, revise and resubmit

From the answer

Proposed status C — not accepted; revise and resubmit. Nine comments address revision, dimension, wall, doorway, slab-level and penetration coordination.

Saved files

  • SSL-ZZ-00-DR-S-2100_P02_GA_GF_Marked-up.pdf – Marked-up GA and comments sheet, A3, 3 pages: numbered red comments (ours vs theirs) and proposed status
  • SSL-ZZ-00-DR-S-2100_P02_GA_GF_Comment sheet.xlsx – Editable comments sheet with response columns for the engineer
  • Document register.xlsx – Document register updated with the received drawing

Measured, not estimated.

4 min 37 s

ArchX working time for this brief, measured.

Run of 1 November 2026

9

numbered comments, each with our value against theirs

Run of 1 November 2026

10215 vs 10115

north dimension string re-added: it does not close to the stated overall

Run of 1 November 2026

P02, not P03

wrong revision received picked up before any dimension was checked

Run of 1 November 2026

How to.